References: Torav Carbon Fibers
Decatur, AL Installation of 300 truckloads of carbon fiber manufacturing machinery. This machinery was offloaded, uncrated, assembled and installed with extremely tight alignment specifications of .05mm. Equipment consisted of 60,000 Ib. tanks, 50,000 Ib. towers, 100,000 Ib. furnaces, drive stations, rolls, baths, pumps, and fans. Torav Flourofibers Decatur, AL Dismantled, loaded and transported 47 truckloads of Teflon Fiber Strand equipment from Richmond, VA to Decatur, AL. Offloaded, set, levelled and aligned equipment in Decatur, AL. The removal site in Richmond, VA was a Dupont facility, we were given the highest compliments by Dupont Safety about our quality and safety practices while on the job. Project was completed earlier than timeline required by customer. Aida Dayton Techrtolgies Dayton, OH Offloaded, assembled and set multiple presses at JSC in Rockmart, GA including 2,500 Ton & 3,000 Ton Metal Transfer Stamping Presses which shipped to site in 75 separate crates for each press. Single heaviest picks on projects were Bed: 465,000 Ib. and Crown: 505,000 Ib.. The Crown unit had to be lifted 35' and set on keyways with minimal clearance. Aladdin Temprite Nashville, TN Dismantled, loaded and transported Injection Mold Machines, extruders, and thermofomers to Hendersonville, TN. Offloaded, set, levelled and aligned machinery at new facility. Nippon Express Corporation Los Angeles Offloaded and installed all presses at new facility (Unipres - Portland, TN) Including a range of presses from 200 Ton to 2,000 Ton. Greer Stop Nut Nashville, TN Relocated entire production plant including over 160 truckloads of equipment, raw material and finished goods. Production Machinery Corporation Mentor, Ohio We have installed two (2) Push Type Steel Pickle Lines and Acid Regeneration Plants. One plant located at Mitchell Steel in Nashville, Tennessee ($425, 000.00), and the other at Capital Metals in Torrance, California ($1,200,000.00). Challenger Electrical Materials Challenger Union Box Albermarle, North Carolina/Parkersburg, West Virginia Contract to disconnect, tag, load, transport, unload, set level, and reassemble all equipment located in Challenger plants in Albermarle, North Carolina and Parkersburg, West Virginia, and relocate in Portland, Tennessee, plant. James River Corporation Bowling Green, Kentucky Contract to unload, set in place, align, level, and anchor all components on 892 Accuflex Printing Press, Kidder Stacy Unit (Cost: 6.5 million - proto-type model). Major Companies worked for: Toray, Dell, Komatsu, Toshiba, Dupont, Pillsbury, Bosch, Purity, Gibson, Owens Corning, Porter Cable, Vanderbilt University ![]() |
© 2005 Copyright, Continental Machinery Movers, All Rights Reserved. |