Aida Dayton Technolgies Dayton, OH: Offloaded, assembled and set multiple presses at JSC in Rockmart, GA including 2,500 Ton & 3,000 Ton Metal Transfer Stamping Presses which shipped to site in 75 separate crates for each press. Single heaviest picks on projects were Bed: 465,000 lb.....

Rig, offloaded and set rolling film line. This was the first Avanti plant instlled in America and involved setting approximately 20 shipping containers of structure, roll machinery, extruders, material handling and shipping machinery up to 35,000Lbs. each.

Challenger Electrical Materials: Contract to disconnect, tag, load, transport, unload, set level, and reassemble all equipment located in Challenger plants in Albermarle, North Carolina and Parkersburg, West Virginia, and relocate to Portland, Tennessee, plant.

Rigged and set 150,000lb. Rod Mill onto trunnion bearings with a combination of Continental's 75 Ton Trilifter and 400 Ton gantry System. Rod Mill had to be transloaded to Continental's 100 Ton Die Cart and moved into place, then lifted 25' and set onto bearing with minimal clearance.

Toray Carbon Fibers Decatur, AL: Installation of 300 truckloads of carbon fiber manufacturing machinery. This machinery was offloaded, uncrated, assembled and installed with extremely tight alignment specifications of .05mm.....

Toray Flourofibers Decatur, AL: Dismantled, loaded and transported 47 truckloads of Teflon Fiber Strand equipment from Richmond, VA to Decatur, AL. Offloaded, set, levelled and aligned equipment in Decatur, AL.....